Search all SAP sites

Saturday, April 4, 2009

SAP PP – Important Tables – Part 3

Material Requirement Planning

Menu Nodes           TransactionActivity

Master Data          MD25       Create planning calendar

                     MD26       Change planning calendar

                     MD27       Display planning calendar

                     MDSA       Display BOM explosion number

                     MDSP       Edit BOM explosion number

                     MEQ1       Maintain quota file

                     OPPP       Explode BOM by date

                     MDUS       Display project assignment

                     MDUP       Process project assignment

                     MDL1       Create production lot

                     MDL2       Change production lot

                     MDL3       Display production lot

Planning             MD20       Create planning file entry

                     MD21       Display planning file entry

                     MDAB       Set up planning file entry in background

                     MDRE       Check planning file entry

                     MD01       Total planning online

                     MDBT       Total planning in background

                     MD03       Single-item, single-level planning

                     MD02       Single-item, multi-level planning

                     MD43       Interactive single-item planning

                     MD50       Multi-level, make-to-order planning

                     MD51       Multi-level project planning

                     MF52       Display planning table

                     MF50       Change planning table

                     MF57       Planning table by MRP lists

                     MF51       Planning table by production list

Evaluations          MD04       Stock/requirements list

                     MD07       Collective access of stock/requirements lis

                     MD05       MRP list

                     MD06       Collective access of MRP lists

                     MDLD       Print MRP list

                     MD45       Planning result

                     MD46       Collective access of planning result

                     MD44       Planning situation for a material

                     MD47       Planning situation for a product group

                     MD48       Cross-plant planning situation

                     MD4C       Order report

                     MD09       Pegged requirements

                     CO46       Order progress

Planned Order        MD11       Create planned order

                     MD12       Change planned order

                     MD13       Individual access of planned order

                     MD16       Collective access of planned orders

                     MD14       Individual conversion of planned order into

                     MD15       Collective conversion of planned orders int

                     MDUM       Convert planned order into purchase requisi

                     CO40       Convert individual planned order into produ

                     CO41       Collective conversion of planned orders int

                     CO48       Partial conversion of planned order into pr

                     COR7       Individual conversion of planned order into

                     COR7_PC    Collective conversion of planned orders int

                     COR8       Partial conversion of planned order into pr

                     MDVP       Collective availability check

                     MDAC       Execute action for planned order

LONG TERM PLANNING

PALNNING SCENARIO    MS31       CREATE

                     MS32       CHANGE

                     MS33       DISPLAY

PLANNING RUN         MS01       ON LINE

                     MSBT       SA BACKGROUND JOB

                     MS02       SINGLE ITEM - MULTI LEVEL

                     MS03       SINGLE ITEM - SINGLE LEVEL

                     MS50       SINGLE ITEM - SALES ORDER

                     MS51       SINGLE ITEM PLANNING, PROJECT

                     MFSO       PLANNING TABLE

EVALUTIONS           MS05       MRP LIST MATERIAL

                     MS06       MRP LIST COLLECTIVE DISPLAY

                     MSLD       PRINT MRP LIST

                     MS04       STOCK/REQUIREMENTS LIST

                     MS07       STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY

                     MS44       PLANNING SITUATION MATERIAL

                     MS47       SITUATION PRODUCT GROUP

MPS-MASTER SCHEDULE ITEMS

TOTAL PLANNING       MD40       ON LINE

                     MDBS       SA BACKGROUND JOB

                     MD41       SINGLE ITEM - MULTI LEVEL

                     MD42       SINGLE ITEM - SINGLE LEVEL

                     MD43       SINGLE ITEM - INTERACTIVE

                     MD50       SINGLE ITEM - SALES ORDER

                     MD51       SINGLE ITEM PLANNING, PROJECT

*** EVALUTION IS SIMILAR TO MRP

PRODUCTION CONTROL

ORDER - CREATE       CO01       WITH MATERIAL

                     CO07       WITHOUT MATERIAL

                     CO40       FROM PLANNED ORDER

                     CO41       COLLECTIVE CONVERTION OF PLANNED ORDER

                     CO08       FOR SALES ORDER

                     CO10       FOR PROJECT

                     CO02       CHANGE

                     CO03       DISPLAY

CONTROL              MD04       STOCK/REQUIREMENTS LIST

                     COHV       MASS PROCESSING

                     COMAC      COLLECTIVE AVAILABILITY CHECK

                     CO05N      COLLECTIVE RELEASE

                     CO04N      PRINT

                     CO09       AVAILABILITY OVER VIEW

GOODS MOVEMENT       MF65       STOCK TRANSFER FOR RESERVATION

MATERIAL STAGING     MF68       LOG

                     MB1A       GOODS ISSUE

                     MB31       GOODS RECEIPT

                     COWBPACK   PACK MATERIAL

CONFIRMATION         CO1V       TIME TICKET

FOR OPERATION        CO14       DISPLAY

                     CO13       CANCEL

                     CO1L       REQUESTED CONFIRMATIONS

                     CO1P       PREDEFINED PROCESSES

TOOLS-ARCHIVING      CO78       ORDER

                     KOAA       SETTELMENT DOCUMENTS

CAPACITY PLANNING

EVALUTION            CM01       LOAD


 

WORK CENTER VIEW     CM02       ORDERS

                     CM03       POOL

                     CM04       BACKLOG

                     CM05       OVERLOAD

                     CM07       VARIABLE

EXTENDED EVALUTION   CM50       WORK CENTER VIEW

                     CM51       INDIVIDUAL CAPACITY VIEW

                     CM52       ORDER VIEW

LEVELLING            CM21       PLANNING TABLE (GRAPHICAL)

WORK CENTER VIEW     CM22       PLANNING TABLE (TABULAR)

INDIVIDUAL CAPACITY VCM27       PLANNING TABLE (GRAPHICAL)

                     CM28       PLANNING TABLE (TABULAR)

ORDER VIEW           CM31       PLANNING TABLE (GRAPHICAL)

                     CM32       PLANNING TABLE (TABULAR)

AVAILABLE CAPACITY   CR12       CHANGE

CAPACITY             CR13       DISPLAY

                     OP4A       SHIFT SEQUENCE

                     OP43       FACTORY CALENDER

SAP PP – Important Tables – Part 2

SALES AND OPERATIONS PLANNING

PRODUCT GROUP        MC84       CREATE

                     MC86       CHANGE

                     MC85       DISPLAY

GRAPHIC              MC91       PRODUCT GROUP

                     MC92       OVERVIEW

PLANNING             MC81       CREATE

FOR PRODUCT GROUP    MC82       CHANGE

                     MC83       DISPLAY

                     MC75       TRANSFER PG TO PLANNING

FOR MATERIAL         MC87       CREATE

                     MC88       CHANGE

                     MC89       DISPLAY

                     MC74       TRANSFER MATERIALS TO DM

                     MC9K       MATERIAL AVAILABILITY

VERSION MANAGEMENT   MC78       COPY

                     MC80       DELETE

FLEXIBLE PLANNING    MC93       CREATE

PLANNING             MC94       CHANGE

                     MC95       DISPLAY

                     MC9K       MATERIAL AVAILABILITY

TOOLS/PLANNING TYPE  MC8A       CREATE

MACRO                MC8B       CHANGE

                     MC8C       DISPLAY

EVENT                MC64       CREATE

                     MC65       CHANGE

                     MC66       DISPLAY

ROUGH CUT PLANNING   MC35       CREATE

PROFILE              MC36       CHANGE

                     MC37       DISPLAY

ENVIRONMENT          MC90       TRANSFER MATERIALS TO DM

ACTIVITY REQT.       KSPP       TRANSFER TO COST CENTRE

                     KSBL       COST CENTRE OLANNING REPORT

                     KSOP       TRANSFER TO ACTIVITY BASED COSTING

                     CPBL       PLANNING REPORT PROCESSES

                     MC9C       REPORTING

SETTINGS             MC96       FORECAST PROFILE

DISSAGGRIGATION      MC76       BREAKDOWN PG PLAN

                     MC77       DISPLAY PG PLAN

                     MC75       TRANSFER PG TO PLANNING

                     MC74       TRANSFER MATERIALS TO DM

FORECASTING

INDIVIDUAL FORECAST  MP30       EXECUTE

                     MP31       CHANGE

                     MP32       DISPLAY

TOTAL FORECAST       MP38       EXECUTE

                     MP33       REPROCESS

                     MP39       PRINT

                     MPBT       EXECUTE BACKGROUND

                     MPDR       PRINT BACKGROUND

DEMAND MANAGEMENT

PIR                  MD61       CREATE

                     MD62       CHANGE

                     MD63       DISPLAY

                     MD65       REQTS. FOR SCINARIO

                     MD66       COPY SIMULATED DEPENDENT REQT.

                     MD70       COPY TOTAL FORE CAST

EVALUATION           MD73       DISPLAY TOTAL REQT.

                     MD79       EXCELL INTERFACE

                     MD4C       ORDER REPORT

                     MD72       CHARECTERISTICS PLANNING

CUSTOMER REQT.       MD81       CREATE

                     MD82       CHANGE

                     MD83       DISPLAY

REPETITIVE MANUFACTURING

MASTER DATA          C223       PRODUCTION VERTION

PRODUCT COST PLANNING

COSTING RUN          CKMATSEL   CREATE

SELECTION LIST       CKMATCON   Edit

                     CK40N      EDIT COSTING RUN

PP – Important Tables – Part 1

MATERIAL

CREATE-GENERAL       MM01       IMMEDIETELY

                     MM11       SCHEDULE

CHANGE               MM02       IMMEDIETELY

                     MM12       SCHEDULE

                     MM13       ACTIVATE

FLAG FOR DELETION    MM06       IMMEDIETELY

                     MM16       SCHEDULE

DISPLAY              MM03       DISPLAY CURRENT

                     MM19       DISPLAY AT KEY DATE

DISPLAY CHANGES      MM04       ACTIVE CHANGES

                     MM14       SCHEDULE CHANGES

                     MM17       MASS MAINTENANCE

                     MMAM       CHANGE MATERIAL TYPE

OTHER                MMBE       STOCK OVERVIEW

                     MMPV       CLOSE PERIOD

                     MMRV       ALLOW POSTING TO

                                PREVIOUS PERIOD

                     MM50       INSTANT MATERIAL VIEW

                     MMSC       ENTER STORAGE LOCATIONS

                     MM60       MATERIAL LIST

ARCHIVING(MATERIAL)  MM71       ARCHIVE/DELETE

                     MM72       DISPLAY ARCHIVE

BILL OF MATERIAL (MATERIAL BOM)

                     CS01       CREATE

                     CS02       CHANGE

                     CS03       DISPLAY

EXTRAS               CS28       ARCHIVING

                     CS20       MASS CHANGES

EVALUATION/BOM       CS11       BOM MULTILEVEL

EXPLOSION/MATERIAL   CS12       STRUCTURE MULTILEVEL

BOM                  CS13       SUMMURISED BOM

WORK CENTRES

                     CR01       CREATE

                     CR02       CHANGE

                     CR03       DISPLAY

                     CA85       REPLACE

CAPACITY             CR11       CREATE

                     CR12       CHANGE

                     CR13       DISPLAY

HIERARCHY            CR21       CREATE

                     CR22       CHANGE

                     CR23       DISPLAY

LINE HIERARCHY       LDB1       CREATE

                     LDB2       CHANGE

                     LDB3       DISPLAY

REPORTING            CR60       W/C INFORMATION SYSTEM

                     CR05       W/C LIST

                     CR06       COST CENTRE ASSIGNMENT

                     CR07       W/C CAPACITIES

                     CR08       W/C HIERARCHY

WHERE USED           CA80       WORK CENTRE

                     CR15       CAPACITY

                     CR10       CHANGE DOCUMENTS

EXTRAS               CR09       STD. TEXTS TASK LIST

                     CR41       ARCHIVING

ROUTING        

STAD. ROUTING        CA01       CREATE

                     CA02       CHANGE

                     CA03       DISPLAY

REF. OPERATION SETS  CA11       CREATE

                     CA12       CHANGE

                     CA13       DISPLAY

RATE ROUTING         CA21       CREATE

                     CA22       CHANGE

                     CA23       DISPLAY

REF. RATE ROUTING    CA31       CREATE

                     CA32       CHANGE

                     CA33       DISPLAY

EXTRAS               CA85       REPLACE W/C

MASS CHANGES         CA95       REPLACE REF. OP. SET

                     CA75       REPLACE PRT

DELETE TASK LIST     CA99       WITH ARCHIVING

                     CA98       W/O ARCHIVING

REPORTING            CA80       WORK CENTRE

WHERE USED LIST      CA90       REF. OP. SETS

                     CA70       PRODUCTION RESORCE TOOLS

COST CENTRE

                     OKKP       MAINTAIN CONTROLLING AREA

                     KS01       CREATE COST CENTRE

                     KZS2       CREATE COSTING SHEET

                     KA01       CREATE PRI. COST ELEMENT

                     KA06       CREATE SEC. COST ELEMENT

                     KL01       CREATE ACTIVITY TYPE

                     KP26       ACTIVITY TYPE/PRICE PLANNING


 

Tuesday, March 31, 2009

collective TECO of prod order

For Coolective TECO of Prod order, use COHV/COHVPI
if i collectively want to delete planned order, I would use MD16

Copyright SAP Production Planning | Using the GreenTech Theme | Bloggerized by Falcon Hive.com